Subfloor prep & leveling
The slab or subfloor checked, cleaned and leveled before a single plank goes down.
Firenova services
Vinyl plank, laminate and tile installed on properly prepared subfloors, with the baseboards, transitions and stairs finished to match.

The work
Most flooring problems start below the surface: an unleveled slab, moisture nobody checked, transitions left for later. Firenova preps and levels the subfloor first, then installs vinyl plank, laminate or tile with tight seams and clean transitions between rooms.
Stairs, closets and baseboards are part of the job, not extras. The result reads as one continuous, finished surface through the whole space.
Request a free estimateScope
The slab or subfloor checked, cleaned and leveled before a single plank goes down.
Water-resistant floating floors installed with tight seams and correct expansion gaps.
Floor tile set flat and straight, with layouts planned from the room, not the corner.
Stairs, baseboards and thresholds finished so the floor reads as one surface.
From our projects
Part of the 415-photo portfolio. Every image is from a Firenova project.
FAQ
Vinyl plank is the most requested: it handles humidity, cleans easily and looks like wood. Firenova helps you choose per room based on how the space is used.
Yes. Demolition and haul-away of the existing floor are part of the scope when needed.
Always. The subfloor is checked and corrected before installation, because that is where most floor problems start.
Single rooms take days; a whole home is scheduled in stages. You get a concrete timeline with the estimate.
Free estimate
Send the details through the form, call (305) 315-6199 or message the team on WhatsApp. Firenova reviews every request and follows up.